国内我的网站主页 > 我的网站国内 >
摘要:百思不得姐...

木棉花的春天

People of the northern Bangladesh want to see China's Suqian City on the banks of the Teesta_我的网站

穆赫兰道

一 |     Dhaka, Oct 9 (UNI) Teesta is one of the 54 rivers that enter Bangladesh from India. After originating from Solamo Lake in India, it flows over Sikkim and West Bengal and enters Bangladesh through Rangpur region.

Later it joins the Brahmaputra river near Chilmari in Kurigram district. For many years there has been a demand for a Teesta agreement on the sharing of Teesta water. But the agreement is stuck due to India's delay and various excuses. Because of this, the people of the northern part of Rangpur Bangladesh are now dreaming about the Teesta Master Plan.

The Teesta Agreement was to be signed during the then Prime Minister of India Manmohan Singh's visit to Dhaka in 2011. But it stalled in the face of opposition from West Bengal Chief Minister Mamata Banerjee. Then in 2015 Indian Prime Minister Narendra Modi visited Bangladesh with Mamata Banerjee. There he assured that a compromise would be reached on Teesta water sharing. But the Teesta problem has not been solved.

During the last Bangladesh Prime Minister Sheikh Hasina's visit to India, there was a possibility of reaching a settlement on Teesta water distribution, but it did not happen.

In addition to the construction of various infrastructure related to Teesta coast management, flood control dams and various types of infrastructure will be built to eliminate water shortage during summer. Since Bangladesh has a long-standing dispute with India over Teesta water sharing, arrangements will be made to retain water during the dry season. Among the issues that have dominated the project so far, three are important—dredging the riverbed, revetment or embankment repair and embankment, and land reclamation. Apart from this, there are also plans to repair flood dams.

If this project named 'Teesta a River Comprehensive Management and Restoration' is implemented, a 220 km high guide dam, river drive, hotel-motel-restaurant, modern city and tourist center will be developed along both the right and left banks of the Teesta river. Along with that, 150 MW solar power plant, industrial plant, EPZ will be built.

Apart from this, several lakh hectares of agricultural land will be saved and afforested. Under this project, the main stream of Teesta will be two kilometers, which will maintain navigability throughout the year. It will be connected by several canals, which will benefit crores of people of Teestapar. It is said that the two banks of the Teesta will be modernized on the model of China's Huang Ho River and Suqian City through the master plan. There will be Marine Drive on both sides of the embankment. Modern irrigation projects and agricultural farms with machinery will be built. At the same time satellite cities will be built on both banks of the river.

The two banks of the Teesta will be developed on the model of Suqian City in East China's Jiangsu Province. For this, approximately 9 thousand crore taka can be spent. The project is named Teesta River Comprehensive Management and Restoration'. Since then, days go by, months go by, years go by and years come. However, the much-desired great plan has not started.

Chinese Ambassador Li Jiming visited the Teesta Barrage on Sunday, October 9.

At this time, he listened to the hopes and aspirations of the people of the area. A large number of local people, civil society and administration people were present.

It is noted that, Rangpur is the poorest division of Bangladesh. And five of the country's poorest and most impoverished districts are located across the ravaged Teesta. Pagla river famous Teesta Lalmonirhat, Nilphamari, Rangpur, Kurigram and Gaibandha districts is the name of the misery of millions of people. The flow of the 234-year-old Teesta is causing floods and droughts every year in these five districts. People's sighs are getting heavier because of this, the life cycles of both sides are constantly changing.

UNI BAV SHK1835。    在特朗普政府持续打击企业雇佣相关行为的背景下,德勤将向美国政府支付2150万美元,就其多元化政策涉嫌存在歧视、违反联邦政府采购合同相关法律的指控达成和解。美国司法部周二表示,这家会计师与咨询企业为员工队伍构成设定了以种族、性别为导向的目标,并将合伙人数万美金的薪酬与上述目标完成情况挂钩;这与其承诺在招聘和晋升环节不实施歧视的保证相违背。

二 | (新浪财经)原文链接。

Current article:http://www.bianhajieleigoukusunmen.pics/usw/vys2d.doc

Published on:00:11:38